Navigation

News

Open access to railway infrastructure granted to 4 carriers

04.01.2021

In November and December 2020 the President of the Office of Rail Transport issued 11 administrative decisions granting 4 railway carriers open access to railway infrastructure. The legal basis for most of the decisions was Regulation 869/2014, which expired on December 12, 2020.

The President of UTK issued decisions granting open access to four railway carriers:

  • Polregio sp. z o.o. – 8 decisions,
  • Koleje Mazowieckie – KM sp. z o.o. – 1 decision,
  • Koleje Dolnośląskie S.A. – 1 decision.
  • RegioJet a.s. – 1 decision.

Non-confidential versions of these decisions were published in the Official Journal of the President of the Office of Rail Transport.

- I am glad that I was able to issue further decisions granting open access. I trust that these decisions will contribute to increasing competitiveness. The passengers will benefit from additional connections, both all-year-round and seasonal, which complement the basic transport offer under public service contracts – comments Ignacy Góra, the President of the Office of Rail Transport.

The legal basis for 10 administrative decisions was Regulation 869/2014 which expired on December 12, 2020. It means that the legal basis for pending and future open access proceedings will be Regulation 2018/1795. One of the most important changes in Regulation 2018/1795 is that the applicant is required to notify the infrastructure manager and the President of Office of Rail Transport (i.e. regulatory body) of its intention to operate a new rail passenger service in advance – at least 18 months before the entry into force of the annual train timetable under which the proposed open access service is to be provided. The compliance with this deadline is a guarantee that the services will start within the time limit specified by the applicant if the regulatory body issues a decision granting open access.

Basic information on the services which will be provided under the open access decisions you will find below:

No.

Applicant Connection

Stops

End of service
(date)

1.

Polregio

Białystok –

Zielona Góra Główna

Białystok, Łapy, Szepietowo, Czyżew, Małkinia, Tłuszcz, Warszawa Wschodnia, Warszawa Centralna, Warszawa Zachodnia, Sochaczew, Łowicz Główny, Kutno, Koło, Konin, Słupca, Września, Swarzędz, Poznań Główny, Buk, Opalenica, Nowy Tomyśl, Zbąszyń, Zbąszynek, Babimost, Sulechów, Zielona Góra Główna

31.12.2024

2.

Polregio

Gdynia Główna –

Wrocław Główny

Gdynia Główna, Sopot, Gdańsk Oliwa, Gdańsk Wrzeszcz, Gdańsk Główny, Tczew, Pelplin, Smętowo, Laskowice Pomorskie, Bydgoszcz Główna, Inowrocław, Mogilno, Gniezno, Poznań Główny, Czempiń, Kościan, Leszno, Rawicz, Żmigród, Oborniki Śląskie, Wrocław Mikołajów, Wrocław Główny

31.12.2024

3.

Polregio

Gdynia Główna –

Poznań Główny

Gdynia Główna, Sopot, Gdańsk Oliwa, Gdańsk Wrzeszcz, Gdańsk Główny, Tczew, Pelplin, Smętowo, Laskowice Pomorskie, Bydgoszcz Główna, Inowrocław, Mogilno, Gniezno, Poznań Główny

31.12.2024

4.

Polregio

Olsztyn Główny –

Kołobrzeg

Olsztyn Główny, Olsztyn Śródmieście, Olsztyn Zachodni, Morąg, Pasłęk, Elbląg, Malbork, Tczew, Gdańsk Główny, Gdańsk Wrzeszcz, Gdańsk Oliwa, Sopot, Gdynia Główna, Rumia, Wejherowo, Lębork, Słupsk, Sławno, Koszalin, Ustronie Morskie, Kołobrzeg

31.12.2024

5.

Polregio

Gdańsk Główny –

Kołobrzeg

Gdańsk Główny, Gdańsk Wrzeszcz, Gdańsk Oliwa, Sopot, Gdynia Główna, Rumia, Wejherowo, Lębork, Słupsk, Sławno, Koszalin, Ustronie Morskie oraz Kołobrzeg.

31.12.2024

6.

Polregio

Wrocław Główny –

Kołobrzeg

Wrocław Główny, Wrocław Mikołajów, Oborniki Śląskie, Żmigród, Rawicz, Leszno, Kościan, Czempiń, Poznań Główny, Oborniki Wielkopolskie Miasto, Rogoźno Wielkopolskie, Chodzież, Piła Główna, Szczecinek, Białogard, Kołobrzeg.

31.12.2024

7.

Polregio

Wrocław Główny –

Świnoujście

Wrocław Główny, Wrocław Kuźniki, Brzeg Dolny, Wołów, Ścinawa, Głogów, Bytom Odrzański, Nowa Sól, Zielona Góra Główna, Rzepin, Kostrzyn, Chojna, Gryfino, Szczecin Główny, Szczecin Dąbie, Goleniów, Wysoka Kamieńska, Międzyzdroje, Świnoujście

31.12.2024

8.

Polregio

Łódź Kaliska –

Kraków Główny

Łódź Kaliska, Łódź Pabianicka, Łódź Chojny, Łódź Dąbrowa, Łódź Widzew, Rokiciny, Baby, Piotrków Trybunalski, Gorzkowice, Radomsko, Częstochowa, Koniecpol, Miechów oraz Kraków Główny.

31.12.2024

9.

Koleje Mazowieckie

Warszawa Zachodnia –

Gdynia Główna

Warszawa Zachodnia, Warszawa Centralna, Warszawa Wschodnia, Legionowo, Nowy Dwór Mazowiecki, Nasielsk, Ciechanów, Mława Miasto, Działdowo, Iława Główna, Prabuty, Malbork, Tczew, Gdańsk Główny, Gdańsk Wrzeszcz, Gdańsk Oliwa, Sopot, Gdynia Główna.

01.09.2024

10.

Koleje Dolnośląskie

Wrocław Główny – Tuplice

Wrocław Główny, Legnica, Żagań, Żary oraz Tuplice.

10.12.2022

11.

RegioJet

Praha hlavní nádraží – Przemyśl Główny

Praha hl. n., Pardubice hl. n., Zábřeh na Moravě Olomouc hl. n., Hranice na Moravě, Ostrava-Svinov, Ostrava hl. n., Bohumín, Czechowice-Dziedzice , Kraków Główny i Przemyśl Główny

10.12.2025

Since Regulation 869/2014 is repealed and Regulation 2018/1795 is in force new forms are introduced:

Legal basis

  • Commission Implementing Regulation (EU) No 869/2014 of 11 August 2014 on new rail passenger services (OJ L 239, 12.8.2014, p. 1–10).
  • Commission Implementing Regulation (EU) 2018/1795 of 20 November 2018 laying down procedure and criteria for the application of the economic equilibrium test pursuant to Article 11 of Directive 2012/34/EU of the European Parliament and of the Council (OJ L 294, 21.11.2018, p. 5–14).    
go up